The collapse happened on a Saturday morning when vehicle and pedestrian traffic was significantly less than normal at the busy intersection of Rampart and Canal streets. In addition to the heavy concrete poured on the rooftop five days before the collapse, a large amount of construction equipment can be seen along the Rampart Street edge of the rooftop.